Chariot In Onstage Position
Chariot Offstage
Chariot Offstage
Chariot Backside
Rigging Track- Supported 1 Person & Was Automated Using A Cable Drive Winch
Track Was Rigged To Two Line Sets. The Line Sets Were Secured to the Grid For Safety With Span Sets and 1/2 Ton Chain Hoists
Track Was Rigged To Two Line Sets. The Line Sets Were Secured to the Grid For Safety With Span Sets and 1/2 Ton Chain Hoists
Track Was Rigged To Two Line Sets. The Line Sets Were Secured to the Grid For Safety With Span Sets and 1/2 Ton Chain Hoists
Limit Switches Were Used For Onstage and Offstage Travel- This Is The Maximum Onstage Switch
Track Was Rigged To Two Line Sets. The Line Sets Were Secured to the Grid For Safety With Span Sets and 1/2 Ton Chain Hoists
Turndown Block for Cable to Winch On Floor
Turnbuckle For Tensioning
Limit Switch Used For Maximum Offstage Travel
Trucker Straps Used As Guying Lines On Stage Left
1-1/2 in Schedule 40 Pipe Attached to Mid Rail for Guying Stage Right
Motor used to move the chariot that was controlled by Creative Conners Spikemark software.